Client Name
Copper Mountain Mining Corporation
Location
Princeton, BC
Sector
Mining
Project Description
Duration: 3 months
Crew Size: 16
Highlights:
- 1000m3 concrete poured
- Engineered formwork for substantial wall thickness and height
- Concrete batching and mixer truck delivery
- Over 200,000 lbs of reinforcement installed
- Installed large steel pipe embeds in concrete wall