Back To Category

Maintenance Shop Construction – Red Chris Mine

Client Name
Newcrest
Location
Dease Lake, BC
Sector
Industrial

Project Description

Duration: 11 months

Crew Size: 30

Highlights:

  • 6500m³ concrete poured
  • Construction of in-slab hydronic piping system with boilers & control unit
  • Installation of large embedded steel jacking plates & embedded steel rail wear plates at shop bays
  • Installation of hard-cem integral floor hardener admixture product to increase durability and lifespan of concrete
  • Completion of geotechnical remediation for foundation bearing