Client Name
Newcrest
Location
Dease Lake, BC
Sector
Industrial
Project Description
Duration: 11 months
Crew Size: 30
Highlights:
- 6500m³ concrete poured
- Construction of in-slab hydronic piping system with boilers & control unit
- Installation of large embedded steel jacking plates & embedded steel rail wear plates at shop bays
- Installation of hard-cem integral floor hardener admixture product to increase durability and lifespan of concrete
- Completion of geotechnical remediation for foundation bearing