Komatsu Manufacturing Plant

Client Name
Scott Builders Inc.
Location
Sparwood, BC
Sector
Civil

Project Description

Duration: 13 months

Crew size: 20

Highlights:

  • Excavation of over 100,000 m³ of waste material
  • Supply and Installation of approximately 30,000 m³ of granular base and subbase
  • Supply and Installation of 300m of 150mm, 200mm, and 300mm C900 water mains and fire hydrants
  • Supply and Installation of 750m of 300mm, 375mm, and 450mm PVC SDR35 drainage mains
  • Supply and Installation of a 300 m³ Cultec stormwater recharge chamber
  • Supply and Installation of 900 m³ of cellular concrete
  • Supply and Installation of 900 m³ of cellular concrete, 1500 m³ structural concrete & 1500 m³ continuous flight augering piling concrete
  • Installation of 17 storm and sanitary manholes
  • Installation and testing of 130m of 200mm PVC SDR35 sanitary main
  • Topographic and quantity surveys