Client Name
Scott Builders Inc.
Location
Sparwood, BC
Sector
Civil
Project Description
Duration: 13 months
Crew size: 20
Highlights:
- Excavation of over 100,000 m³ of waste material
- Supply and Installation of approximately 30,000 m³ of granular base and subbase
- Supply and Installation of 300m of 150mm, 200mm, and 300mm C900 water mains and fire hydrants
- Supply and Installation of 750m of 300mm, 375mm, and 450mm PVC SDR35 drainage mains
- Supply and Installation of a 300 m³ Cultec stormwater recharge chamber
- Supply and Installation of 900 m³ of cellular concrete
- Supply and Installation of 900 m³ of cellular concrete, 1500 m³ structural concrete & 1500 m³ continuous flight augering piling concrete
- Installation of 17 storm and sanitary manholes
- Installation and testing of 130m of 200mm PVC SDR35 sanitary main
- Topographic and quantity surveys