Client Name
Taseko
Location
McLeese Lake, BC
Sector
Mining
Project Description
Duration: 5 months
Crew Size: 40
Highlights:
- Construction of a 32m high concrete structure with multiple suspended slabs
- 5000m3 of structural concrete & 15,000m3 of flowable fill poured, batched from on-site portable batch plant
- 1.3M lbs of reinforcement detailed and bent with onsite shearline and bender
- Supplied and operated tower crane & rough terrain crane
- Erected, modified & dismantled access scaffolding
- Provided survey with QA/QC & as-built drawings for turnover packages
- Supplied and installed large, embedded plates & anchor bolts