Back To Category

Crusher Relocation Project – Gibraltar Mine

Client Name
Taseko
Location
McLeese Lake, BC
Sector
Mining

Project Description

Duration: 5 months

Crew Size: 40

Highlights:

  • Construction of a 32m high concrete structure with multiple suspended slabs
  • 5000m3 of structural concrete & 15,000m3 of flowable fill poured, batched from on-site portable batch plant
  • 1.3M lbs of reinforcement detailed and bent with onsite shearline and bender
  • Supplied and operated tower crane & rough terrain crane
  • Erected, modified & dismantled access scaffolding
  • Provided survey with QA/QC & as-built drawings for turnover packages
  • Supplied and installed large, embedded plates & anchor bolts